The B9025 Deveron Bridge in Turriff is to close for 2 weeks for resurfacing works. The road will be closed to traffic between 7am & 7pm from 15 to 29 September. The road will be open during the night and controlled by traffic lights. The diversion route will be along the A947 to Banff over […]
Road Works
High Street Turriff to be closed for 2 weeks
Turriff High Street will be closed for 2 weeks from Monday 1 September to allow resurfacing works to be carried out. Pedestrian access will be maintained and vehicle access to properties along the affected road will be maintained when possible and practicable to do so.